We are underway with the expansion of the Adaptive Trail system in the McKeldin Area of the park. The additional 3.5 miles will be constructed by DirtSculpt for a full five-mile adaptive loop – the only dedicated natural surface adaptive loop in a Maryland State Park.
Construction begins on October 14, 2024.


